80 loads (1,468.80 cubic yards) were hauled yesterday, from Redington Shores. We appreciate everyone’s patience through this recovery process!
2024 Hurricane Helene debris removal operations commenced at 0700 in the town of Redington Shores, FL today. Representatives from Rostan and Phillips & Jordan mustered prior to commencing field operations to outline the daily operating plan and discuss health and safety best practices. Phillips & Jordan utilized 16 hauling units throughout the day to remove and properly dispose of hurricane debris from designated Rights-of-Way (ROWs). Debris removal operations continued until 1900.
DOWNLOAD FULL REPORT PDF