ATTN HOMEOWNERS & CONTRACTORS:

During your design stage, ensure you incorporate Duke utility requirements into your plan – before Plan Review. For example, Duke Energy may require:

  • Permanent stairs.
  • A landing or platform at the meter (3’ x 5’).
  • Safe access for meter replacement and emergency disconnects.

These requirements may lead to stair and landing encroachments.

Here are the best contacts for Duke requirement questions:

  1. Builder/Developer Line (Best for design and construction questions)
    • 866-372-4663
    • Monday–Friday, 7:00 a.m.–6:00 p.m.
    • They can connect you with the local engineering representative for your project or municipality.
  2. General Customer Service
    • 800-700-8744
    • Ask to be transferred to Builder Services, New Construction, or Distribution Engineering if your question concerns meter placement on elevated homes.
  3.  Builder Portal
    • You can also submit design questions and service requests through the Builder Portal. It is intended for contractors, builders, and developers working on new construction or substantial renovations.

Download PDF: Duke Energy Service Requirements on New Builds and Elevated Homes