Hurricane and Tropical Storm Recovery Permitting Guide

Post-Storm Repairs: Permit Requirements

Find Out What Building Permits You Need

Post-Storm Permit Application Process

How to apply:

  • Via Online Portal
  • In person at the Building Department at Town Hall, 17425 Gulf Blvd., Redington Shores, FL 33708
  • Please review our Permit Guide.

Required documents:

Expedited review categories include:

  • Roofs
  • Electrical service reconnections
  • Water-damage-related HVAC replacements

Process Modifications to Expedite Recovery

  • Temporary field office permitting stations (if activated)
  • Dedicated storm recovery hotline or queue
  • Permit fee deferment options (if activated by Commission resolution)
  • Fast-track plan review for emergency electrical and unsafe structure repairs
  • Inspection adjustments including extended hours and approved virtual inspections

Physical Locations Offering Permitting Services

  • Town Hall, 17425 Gulf Blvd., Redington Shores, FL 33708

Local Requirements for Rebuilding

Elevation Requirements for Substantially Damaged or Improved Buildings:

  • FEMA Base Flood Elevation (BFE) + 3ft for Residential and 2ft for Non-Residential
  • Compliance with the latest Florida Building Code and local amendments

Local Code References: