THE TOWN HAS HIRED A CONTRACTOR TO TELIVISE AND CLEAN THE TOWN’S SEWER SYSTEM. THIS PROJECT WILL HELP THE TOWN DETERMINE WHERE WE HAVE INFILTRATION INTO THE SYSTEM. DURING THIS PROJECT SOME HOMES MAY EXPERIENCE BUBBLING OR SPLASHING WATER FROM TOILETS/SHOWERS/TUBS/ OR SINKS. IT IS SUGGESTED TO COVER THESE AREAS WITH TOWELS OR OTHER ABSORBANT MATERIAL. ANY WOOD FLOORS AROUND THESE AREAS ALSO SHOULD BE COVERED.
BELOW IS A SCHEDULE OF THE PROJECT – GIVE OR TAKE A DAY OR TWO DEPENDING ON ISSUES THAT MAY ARISE.
  • 8/19/2016 – 183RD TERRACE WEST NORTH TO 180TH AVE WEST
  • 8/22/2016 – CORAL AVE NORTH TO 177TH TERRACE WEST INCLUDING LEE AVE.
  • 8/29/2016 – 175TH TERRACE, 175TH AVE, 1ST STREET, 2ND STREET, 176TH AVE, 176TH TERRACE DRIVE, 176TH AVE. CIRCLE, STERLING TERRACE, LONG POINT DRIVE, WALL STREET, WALL CIRCLE AND WALL TERRACE
  • 9/6/2016 – 177TH AVE. WEST, LEE AVE., 176TH TERRACE WEST, 176TH AVENUE WEST, 174TH TERRACE DRIVE, 174TH AVE. EAST, 1ST STREET AND 2ND STREET.
IF YOU HAVE ANY QUESTIONS OR CONCERNS PLEASE CALL TOWN HALL – 397-5538